C302: Advanced Maintenance Planning

Make sure that your artisans are used efficiently by giving them tasks that are "ready to go" **

Credits 16
Level 5
Total Study Hours 80
In-Class 40
Private Study 16
Assignment 24

While the Maintenance Planning course (C301) fundamentally prepares a planner for the task of planning, more is required to ensure a high level of output from the planning function. This has led to many requests for an advanced course.

Maintenance planning is the function that ensures that the correct maintenance actions are performed to the right equipment at the right time, and having all necessary preparation and resources in place. It is furthermore arguably the function that ensures that all maintenance actions can be completed correctly and efficiently.

C302 2

Maintenance Planning is becoming more and more important to secure the success of maintenance actions. The theory and tools of maintenance planning are also becoming more sophisticated.

C302 3

The Maintenance Planning course (C301) prepares planners to understand the first part of the planning process, namely Work Order Planning. But it does not address the process of preparing the Weekly Schedule, and it does not equip the planner with advanced capabilities, such as Task Design, and Work Measurement. These are provided in this advanced course. This course:

  • Completes the tuition of the planner regarding the full planning function.
  • Prepares he planner for taking the role of senior or head planner after gaining enough experience.

This course (C302) is ideally aimed at the further development of maintenance planners after they successfully completed the course in Maintenance Planning and had time to implement and integrate that knowledge in practice.

Who Should Attend

The course is intended for maintenance planners and those who manage them. Having attended and passed the C301 course is prerequisite for enolling for this course.

** Tasks that are "ready to go" are ones for which all the necessary resources (men, materials, permits, instructions, drawings, manuals, etc.) are available for the artisan to complete the task without delays.

Course Content

Module 1 – Introduction

  • The AM-Tech perspective on business success, and the role of tenance Planning
  • Business types and Asset Management
  • Development of a Maintenance Plan for the organisation
  • Asset Management Value Chain
  • What about planning?
  • Why is planning necessary?
  • Review of Preventive Maintenance from C301
  • Review of Scheduling from C301
  • Review of Task Planning from C301

Module 2 – Task Design

  • Work Study
  • Method Study
    • Step 1: Select tasks for improvement
    • Step 2: Record the relevant facts
    • Step 3: Examine the facts
    • Step 4: Develop improved tasks
    • Step 5: Implement the improved methods
    • Step 6: Maintain the improved methods
  • Task Specification
    • Maintenance Task Analysis (MTA)
    • Task Specification

Module 3 – Task Standards

  • Introduction
  • Methods
    • Time Study
    • Other Techniques

Module 4 – Work Order Scheduling – First Steps

  • Weekly scheduling focus
  • Understanding the Maintenance Planner’s work
  • Priorities and the plan
  • Assembling the work for the plan

Module 5 – Work Order Scheduling

  • Producing the Schedule
  • Work Support & Close-out

Credits 16*, level 5**

* The course comprises 80 hours of study, of which 40 hours are in class, with a further 16 hours of private study, and 24 hours for an assignment.

**Occupational Certificate level

Prerequisites

Completion of C301: Maintenance Planning